м. Київ, вул. Жилянська, 101, 8 пов.
с. Поляниця, уч. Вишні.

Le Méandre
guaranteed income from $5600 per YEAR FROM APARTMENTS IN BUKOVEL

We keep prices in US dollars at the rate of the NBU – it’s time to invest 

LESS THAN 40 NUMBERS REMAIN

Download an individual investment proposal

Technology and architecture

The building uses modern energy saving materials, panoramic facades made of glass and metal, so that landscapes impress you in all seasons. The layout of the apartments allows you to organize a cooking zone (the practice of European resorts, which greatly simplifies the rest with the children), as well as to unite the neighboring rooms for investment or residence in the future (just simply open the door between the rooms).

Le Meandre waiting for

The 8-storey complex nearly Bukovel comprises 173 apartments ranging from 27 to 45 m2, presented in 5 different planning options. On the ground floor there is a restaurant, lounge area, a sports club and an all-seasonly SPA complex with a swimming pool and a sauna. Le Meandre will host tourists already in the 2025 season.

Revenue and rest

You choose the size of the down payment, which will allow you to comfortably pay in installments. Room yield is guaranteed by the management company and provides a yield of 8-12% per annum depending on the price at the time of investment. The managing company takes on the role of promoting the complex and rent the apartments, transparently providing your profit.

Why invest now?

Le Meandre has a number of advantages that make it attractive to future tourists and investors

TRANSPORT ACCESSIBILITY
About 750 m to the ski lift with a separate shuttle for your comfort, which will allow you to enjoy the ride every day.

PROFITABILITY 12% PER ANNUM
Based on the occupancy of the rooms and the dynamics of visiting the resort - a high return on investment is guaranteed.

GREEN ZONE AND PARKING
Well-groomed park, decorated with recreation areas and playgrounds and convenient parking.


100% LEGAL CONSTRUCTION
All the necessary documents for the construction and delivery of the project received.

MODERN TECHNOLOGIES
The architecture of the complex of glass and metal is relevant and fits perfectly into the landscape.

RECREATIONAL COMPLEX
Spa, restaurant, swimming pool, lobby bar and sports complex will make your stay at le Méandre comfortable all year round.

ALL-SEASON SPA AT YOUR SERVICE

construction progress

May

CONSTRUCTION progress as of 23.03.2022

Glory to Ukraine!
Yes, many of our guys went to defend the country, but we have assembled a team and are ready to continue the work.
Groups of masons, monoliths and facades have been formed.
Works on construction of section 1. Finishing of walls and glazing of section 2. Laying of walls of internal partitions of section 2 are resumed.

Currently, part of the verticals of the 3rd floor is ready. Groups of raw material suppliers have already been formed.

Everything will be Ukraine! ??
And good news.
?
We keep the price in February. Don’t delay.

CONSTRUCTION progress 26.04.22

Brief description of construction works
1. Masonry of walls and partitions of 80% of numbers of sections 2 and 3 is completed.
2. Flooded slab 4 floor section 1, viscous reinforcement for verticals continues.
3. Construction works are carried out according to the schedule from November 2021
4. We continue to carry out the plan on 2 floors of a monolith a month.

Peace be upon you all and good.

CONSTRUCTION progress:

28.03
– Installation of a horizontal deck
– Dismantling of vertical structures
– Preparation of the deck for reinforcement work

30.03
– Loading and unloading of fittings
– Laying of walls on the upper floors of section 2
– Preparation of the reinforcing frame for pouring the monolith

03.04
– Received the first “military” ready-mixed concrete
– Pour the floor slab of the 3rd floor
– We work for our investors

to be continued…
???
We remind you that the account for charitable assistance of the National Bank for the Armed Forces has not changed
UA843000010000000047330992708

CONSTRUCTION progress:

Construction progress of Le Meandre apartments near Bukovel Ski Center:
Section 1 – flooded 4 floors of the monolith, continue to build.
Sections 2-3 – technical layout of the test floor for the formation of estimates for engineering, masonry stairwells and bathrooms within the rooms.
Section 2 – masonry of the outer walls of the rooms.

18.04 – 19.04
Reinforcement of a plate,
Cleaning of the territory,
Cutting fittings and preparation of clamps
Knitting of armature to columns


20.04
Pouring 50% of the floor slab of the 4th floor of section 1
Faucet troubleshooting

21.04-02.04
Easter pass

04.05
Bricklaying of bathrooms
Masonry of partitions and door crossbars
Drilling of the armoplate is finished
Installation of formwork on the stairs of 4-5 floors is completed

05.05
Rearrangement of blocks is complete
The masonry of the door crossbar is finished
Bricklaying of a bathroom, Wall column of 1,5 sq.m.
Drilling and leveling of the armoplate are completed and began to install column structures

05/06 – 05/07/2022
Knitting of columnar structures is finished, preparation for pouring
Preparation for knitting the staircase is complete
Knitting of columnar structures is finished.

05/08 – 05/09/2022
Knitting of column constructions
Installation of stairs between 4-5 floors
Masonry of walls and partitions

10-11.05.2022
The masonry of the partitions, the cleaning of the uprights and the knitting of the vertical column structures began and ended.
The partitions of the bathrooms and the outer walls of the 2 apartments have been completed.
Unloading of the gas block.

CONSTRUCTION progress:

July 15-20
Preparing the slab for reinforcement and pouring concrete. Installation of frames. Completing the installation of window elements.

July 20-23
Installation of verticals, masonry parapet, tying of fittings and bending of pipes.

July 24-27
Pouring the plate.

July 28-30
Dismantling of the slab, welding of verticals, breaking of the slab and dismantling of facade cradles.

CONSTRUCTION progress:

August 1-4
Obtaining concrete, pouring the slab.
Dismantling the slab formwork.

August 5-8
Unloading of double-glazed windows with subsequent installation. Completion of dismantling the plate.
Preparation of columns. Pouring the columns of the 6th floor.

August 9-13
Dismantling of column formwork. Sealing window openings.
Pouring the next part of the columns. A set of horizontal formwork. Installation of balconies and windows.
Masonry parapet. Unloading the gas block. Masonry of the walls of the 2nd-3rd floor.

August 14-17
Masonry walls. Drainage. Dismantling of racks. Preparatory works on waterproofing. Installation of waterproofing.

August 18-21
Drainage works. Setting up and preparing the equipment. Waterproofing. Dismantling the crane.

August 22-30
Continuation of crane dismantling, gate installation, drainage and waterproofing works. At the same time, the walls on the floors are being laid.

CONSTRUCTION progress:

September 1-5
Waterproofing
Pumping out water, installing membranes

September 6-9
Unloading construction materials, sewer rings.
Membrane laying on the 2nd-3rd floor of section 1.
Roofing material for waterproofing. Lubrication of rings with resin before installation.

September 10-14
Ordering construction materials. Obtaining isolite.
Drainage, water pumping. Obtaining other building materials. Masonry of the sewage system.

September 15-19
Camera adjustment. Installation and masonry of sewer rings.
Drainage. Preparatory works on waterproofing. Installation of waterproofing.

September 20-24
Preparation for installation of the crane.

September 25-30
Installation of the crane, restoration of monolithic works, installation of formwork and pouring of the columns of the 6th floor.
Masonry of the walls of section 1 on the 4th floor.

Don’t forget to donate to the armed forces of ukraine ??
Victory will be ours ✊

CONSTRUCTION progress:

Description of works
October 1-3
Dismantling of columns, installation of formwork and eaves, concrete has arrived.
Column filling
October 4-6
Unloading of building materials, unloading and installation of formwork.
Membrane laying on the 4th floor of section 1, clean and installation of plywood for pouring concrete. Unloading and working with concrete sewer rings. Welding of fittings.
October 7-9
Marking by a surveyor. Work with the sides of the formwork.
Masonry Unloading of materials.
Plate reinforcement. Loading and welding of fittings.
October 10-12
Masonry of fireplaces, slab reinforcement is completed. Concrete unloading and slab pouring.
Some of the fireplaces have been completed. Points of geodesy.
October 13-16
Knitting columns, fittings, cutting fittings.
They celebrated a little. Column knitting has been resumed. Installation of columns on the 7th floor of section 1.
October 17-19
Masonry of fireplaces, restoration of monolithic works, installation of formwork and pouring of columns of the 7th floor.
Bricks and a gas block have arrived. Installation and knitting of columns, masonry.
October 20-22
Installation and binding of columns, masonry. Plastering of the fireplace. Pouring columns, dismantling and installation of formwork under the remaining columns.
Drainage of parapet masonry. Knitting reinforcement on the elevator cage. Concreting of the elevator shaft.
Laying screed on the roof.
October 23-25
Welding of fittings, masonry of walls and dismantling of formwork.
Insulation of ventilation pipes. Cleaning of plywood and preparation for installation of sand, building materials.
Unloading crushed stone. Masonry of fireplaces, welding and installation of fittings.
Laying of semi-dry screed on the roof is completed.
October 26-28.
Masonry of fireplaces, welding and installation of fittings.
Upholstery of boxes on formwork, bending of fittings. Plastering of the fireplace.
They began to install vent blocks on the floors.
October 29-31
Installing vent blocks, working with fireplaces, unloading glue and building materials.
Sealing vent blocks, installation of fittings. Pouring the slab of the 7th floor (the floor of the 8th floor).
Half of the stove was poured. Roof waterproofing

Do not forget to report to the UAF

CONSTRUCTION progress:

November 1-3
Waterproofing of the roof, masonry of blocks on the 3rd floor of section 1. Installation of ventilation ducts.
Masonry of fireplaces, welding and installation of fittings.

November 4-6
Unloading of building materials, unloading and installation of formwork.
Laying the screed on the roof of section 2. Ordered concrete for the slab

November 7-9
Filling the slab. Viscous columns, sharp, bending of fittings, clamps. Masonry columns.

November 10-12
Masonry of fireplaces, knitting of columns is completed and welding is done. Unloading of the block on the floors, masonry.
Dismantling the formwork. 2 risers of the rainwater system have been laid. Drainage. Stair reinforcement.
November 13-16
Dismantling of columns, display of shields on columns. Column filling. Concrete stairwell. Fittings for strengthening the plate, welding distances. All these days in parallel – masonry of the walls of section 1. Waterproofing, a pipe in the rainwater tank.

November 17-19
Installation of formwork, dismantling of racks. Waterproofing and dismantling of columns.
Bricks and a gas block have arrived. Masonry walls.

November 20-22
Installation, masonry and waterproofing. Expansion of techniques.

November 23-25
Formwork, drainage and waterproofing on the roof. Reinforcement of the slab and masonry from the gas block. Minwata insulation between sections.

November 26-28.
Cleaning the slab from snow, masonry walls. Film covering. Viscous reinforcement.

November 29-30
Plate reinforcement. Roof waterproofing and shield cleaning. Masonry walls. Removal of clay and installation of doors to the warehouse.

CONSTRUCTION progress:

December 1-3
Masonry of the gas block, cleaning of shields, racks and removal of clay, covering of the slab.

December 4-6
Unloading construction materials, in particular pallets of the gas block. Drainage.
Masonry works continue.

December 7-9
Thermal insulation, masonry walls, current repair of the faucet. Delivery of racks to section 2. Water pumping. Installation of fasteners for facade glazing.

December 10-12
The operation of the crane has been restored. Unloading of the block on the floors, masonry. Cleaning the stove.
Reception of concrete and pouring part of the slab.

December 13-16
Masonry of the walls, installation of fasteners on the facade of section 1 continues on an ongoing basis. We received the rest of the concrete, placing the forms on the posts. Pouring the slab and concreting the last roof of section 1.

January 2023

In the last 10 days of 2022, we carried out work on the roof, received and unloaded construction materials and continued masonry on the floors of section 1.
The formwork of the last roof slab was dismantled.
We received a brick and a block to continue the work.
In particular, the parapet on section 1 and the brick fireplaces were bricked.
Masonry of external walls on floors 6-7.
Columns along the perimeter have been poured and mounted.
We continue to prepare rooms before the start of finishing work.
Next comes the communication of section 1 and the installation of ventilation.

March 2023

In the first half of March, 16 to 24 people worked at the facility, engaged in installation work, brickwork of the gas block on floors 3, 5, 6, 8, laying electricity and cleaning the formwork. In the middle of March, they worked on facade works, cleaned the floors, laid electricity and plumbing, and built masonry from the gas block on the remaining floors. Since March 21, more than 20 workers were involved every day, engaged in installation work, brickwork of the gas block on the floors, laying of electricity and waterproofing. Facade work and brickwork from the gas block on the 2nd, 4th and 8th floors, waterproofing was carried out and pipes in fireplaces and plumbing were laid. In total, during March 2023, more than 20 workers were employed on the construction of the Le Meandre hotel apartments. Installation work, brickwork from gas block on different floors, laying of electricity and plumbing, waterproofing and cleaning of formwork were carried out.

June 2023

Installers installed windows on the slope side of section 3. Stonemasons – bricklaying of nodes, walls and blocks of common areas of floors 6-8 in the same section. Monoliths – cleaning the territory, cleaning the formwork, pouring an additional shaft. Electricians – installation of electric wires. Plumbing, boilers and water supply systems are partially installed. Works on installation of electricity and wiring of electricity in rooms.

JuLY 2023

During the period from July 14, 2023, to July 31, 2023, the following works were carried out at the “Le Meandre” construction site:

Concrete Workers:

  • Preparation for pouring the 6th-floor extension.
  • Concrete pouring for the 6th-floor extension.
  • Preparation for pouring the 7th floor in the annex.
  • Concrete pouring for the 7th-floor extension.
  • Installation of formwork for the 5th and 6th floors in the annex.
  • Preparation for pouring the 7th floor in the annex.

Electricians:

  • Preparation for installing outlets in sections 3-6 and the 8th floor.
  • Installation of electrical wiring in sections 7-8 and the 1st floor.
  • Wiring of electricity in apartments, wiring and preparation of outlets, wall chiseling, and cable laying.

Masons:

  • Masonry of walls with gas blocks in sections 7th and 8th floors.
  • Masonry of sanitary units in sections 6th and 7th floors.
  • Cleaning in the 1st section on the 6th floor.

All these works were carried out according to the plan and schedule.

August 2023

Report on the progress of construction works (August 2023) at the “Le Meandre” project:

Section 1:

  • Masons continued laying gas blocks on the 6th floor.
  • Monolith workers prepared the vertical structure for the 7th floor in the extension.
  • Electricians carried out electrical wiring installation on the 6th and 7th floors.

Section 2:

  • Masons completed the laying of gas blocks on the 6th floor.
  • Monolith workers performed the dismantling of the vertical structure on the 7th floor in the extension.
  • Electricians worked on electrical wiring installation on the 6th and 7th floors.

Section 3:

  • Masons continued laying gas blocks on the 5th floor.
  • Monolith workers dismantled the slab on the 5th floor in the extension.
  • Electricians executed electrical wiring installation on the 6th floor.

General Works:

  • Electricians continued electrical wiring installation on various floors, including the 4th and 5th floors.
  • Monolith workers prepared formwork and poured concrete on the 8th floor in the extension.
  • Plasterers performed plastering and preparation on various floors, including the 6th to 8th floors.
  • Masons worked on laying gas blocks and sanitary units on different floors and sections.
  • Facade workers installed attachments on the ventilation facade.
  • Insulation work was completed on the roof.
  • Low-current specialists prepared for cable installation.
  • Plumbers carried out pipe installation on various floors and sections.
  • Excavators conducted ground excavation.
  • Machine operators removed excavated soil.

This updated report provides an overview of the progress of construction works at the “Le Meandre” project in August 2023, grouped by sections and types of work.

MARCH 2024

A boiler room was installed on gas low-temperature heat generators with a built-in heating point for preparing hot water

A complete transformer substation and external power supply networks of the hotel complex building have been installed

The tower crane was dismantled

The glazing of the 1st floor of sections 2 and 3 has been completed

The installation of heating systems in the apartments (underfloor heating) and common areas (radiators installed) has been completed in full.

The water supply and drainage systems in the apartments have been fully installed

The installation of the internal fire water supply system in sections 2 and 3 has been completed in full, installation work has begun in section 1

The installation of power supply systems and weak jet networks in the apartments has been completed in full

The walls in the apartments have been completely plastered

Installation of floors (cement-sand screeds) has begun. Finished screeds in apartments on the 5th, 6th, 7th, 8th floors of section 3.

The preparatory work has been completed and the installation of the elevator equipment has begun

Work on the installation of the monolithic reinforced concrete frame of the expansion zone of the 1st floor of section 3 has been completed in full, and the implementation of the monolithic reinforced concrete frame of the expansion zone of the 1st floor of section 1 has begun.

April 2024

The cement-sand screeds in the apartments of sections 2 and 3 have been completely completed

Plastering of the walls of the bathrooms of the apartments was carried out for finishing.

The monolithic reinforced concrete frame of the extension zone of the 1st floor in section 1 is 90% completed

The installation of the internal fire water supply system in sections 2 and 3 has been completed in full, installation work has begun in section 1

2 elevators were installed and start-up and adjustment works were performed

Construction work on the restaurant kitchen is 60% completed

May 2024

Preparations for the finishing of the walls in the bathrooms of sections 2 and 3 have been completed, namely the leveling of the walls with plasterboard.

Installed boxes under the doors of hidden installation in the bathrooms of sections 2 and 3.

Installation of ventilation and air conditioning systems in all sections has begun

Laying of power cables from floor switchboards to apartments on all sections has been completed

Laying of power cables from floor switchboards to apartments on all sections has been completed

Construction of sewage treatment facilities has begun, namely digging a pit.

A monolithic reinforced concrete frame of the SPA expansion zone in section 1 was made

They started laying the walls from the gas block in the annex

We performed waterproofing of the walls of the expansion of the SPA area in section 1

The monolithic wall and external stairs to the basement of section 3 were completed

CONSTRUCTION progress as of 01.06.2024

Preparation for final wall finishing in the bathrooms (wall leveling with drywall) has been completed in section 3, floors 2, 3, 4, 5, 6.

Preparation for final wall finishing in the bathrooms (wall plastering) has been completed in section 2, 3 for all floors, and in section 1 on floors 7, 8.

Floor screeds have been completed in the apartments and common areas of section 3, floors 3, 4, 5, 6, 7.

Numbered electrical panels have been installed in sections 2, 3 on floors 2, 3, 4, 5.

Installation of air conditioning system risers has been fully completed, and copper piping for the air conditioning system has been installed in the apartments on the 7th floor of all sections.

Installation of the air conditioning drainage system has begun in sections 2, 3.

Ventilation system installation in the bathrooms has been completed in section 3 on all floors.

The installation of the heating system (radiator installation) and water supply and sewage systems has been fully completed on all floors of the annex.

Monolithic reinforced concrete retaining walls have been constructed in the gas storage area.

Installation of external sewage networks has begun.

Final wall and floor finishing in the pilot room (vinyl flooring, wall panels) has been completed, and furniture has been installed.

The installation of the wet facade on the end of section 1 and the annex has begun.

CONSTRUCTION PROGRESS AS OF JULY 2024

Work on sewing columns in apartments type 2B in section 3 from the 2nd to the 8th floor was completed

Plastering of the walls in the apartments of section 3 from the 2nd to the 8th floor has been completed

Preparation for plastering in section 2 from 2nd to 8th floors has been completed

Completed rough equipment (for finishing) of the lift portals of the elevator in section 2 from the 2nd to the 8th floors

Door slopes made of plasterboard in the bathrooms of sections 1 from 2 to 5 floors

50% of the work on drainage has been completed

Work is underway to arrange the wet facade of the eastern part of the hotel.

Completed works on insulation with mineral wool of 150 m2

Work has begun on the arrangement of the access road

The installation of the air conditioning drainage system on floors 6-3 has been completed

Plastering of holes for sockets and pipelines was completed Equipment of ventilation shafts on the roof was completed

50 electrical switchboards were installed in the apartments, equipped with automatic switches

The entrance door in the pilot room has been installed

Work continues on the installation of a monolithic reinforced concrete bowl for sewage treatment facilities

Site planning with an excavator, earthworks are underway

Apartment 2B

45 м2

available floors 2-5

Spacious apartments with a comfortable seating area in the living room, a separate bedroom with a double bed and a spacious bathroom. The highlight of the room is a separate panoramic window facing the bedroom, a panorama in two different directions and a large living room (23.4 m2).

Wi-fi in the room
Double bed
Panorama
Air conditioning
4 persons room
2 beds in room

apartment 2А

39,0 м2

available floors 1-8


Spacious apartment with a compact kitchen area, a wide panoramic window over the entire wall of the room and a spacious bedroom. Nothing unnecessary and reasonable meters will provide you the comfort of two-bedroom apartments with separate bedrooms in the living room at an affordable price.

Wi-fi in the room
Double bed
Panorama
Air conditioning
4 persons room
2 beds in room

apartment 1g

28,72 м2

available floors 2-8

Compact and functional rooms 1G – have everything you need for the bright emotions and relaxation in Bukovel with comfort. The living room with a kitchen of 17.6 m2 will create a cosiness and allow you to relax after a busy ride. Bathroom, wardrobe and dining area – everything is here! And so it’s 25 m2

Wi-fi in the room
Double bed
Panorama
Air conditioning
4 persons room
2 beds in room

apartment 1b

25,9 м2

available floors 1-8

Planning 1B is a large living room with a dining table and cooking area, a panoramic window on the whole room and a functional bathroom. The dressing area will meet you at the entrance to the room, where it is convenient to hang a ski suit and put on Le Meandre’s bathrobe and lie down after a busy day at the souffle near the window.

Wi-fi in the room
Double bed
Panorama
Air conditioning
4 persons room
2 beds in room

apartment 1b with terrace

29+11 м2

available floors 1

It’s hard not to fall in love with this 40 m2 room at Le Meandre Apart Hotel. Compactness, cost-effectiveness both in purchase and in maintenance – and at the same time quick payback and high profitability. Buy an apartment with a terrace on the ground floor as an investment at a comfortable price – you get more for the same money. There are only 4 such rooms available!

Wi-fi in the room
Double bed
Panorama
Air conditioning
4 persons room
2 beds in room

apartment 1v

30,64 м2

доступні поверхи 2-8

Our central 1B apartments are located in the northwestern wing of the complex. In addition to the comfortable planning and spacious studio with a dining table and cooking zone, you get a bonus of unreal sunset in the panoramic window on the entire wall. You can only have a drink in the evening.

Wi-fi in the room
Double bed
Panorama
Air conditioning
4 persons room
2 beds in room

Choose

Planning option

Apartments 1B

Planning 1B is a large living room with a dining table and cooking area, a panoramic window on the whole room and a functional bathroom. The dressing area will meet you at the entrance to the room, where it is convenient to hang a ski suit and put on Le Meandre’s bathrobe and lie down after a busy day at the souffle near the window.

Watch apartments

Apartments 1V

Our central 1v apartments are located in the northwestern wing of the complex. In addition to the comfortable planning and spacious studio with a dining table and cooking zone, you get a bonus of unreal sunset in the panoramic window on the entire wall. You can only have a drink in the evening.

Watch apartments

Apartments 1G

Compact and functional rooms 1G – have everything you need for the bright emotions and relaxation in Bukovel with comfort. The living room with a kitchen of 17.6 m2 will create a cosiness and allow you to relax after a busy ride. Bathroom, wardrobe and dining area – everything is here! And so it’s 25 m2

Watch apartments

Apartments 2A

Spacious apartment with a compact kitchen area, a wide panoramic window over the entire wall of the room and a spacious bedroom. Nothing unnecessary and reasonable meters will provide you the comfort of two-bedroom apartments with separate bedrooms in the living room at an affordable price.

Watch apartments

Apartments 1b with teracce

It’s hard not to fall in love with this 40 m2 room at Le Meandre Apart Hotel. Compactness, cost-effectiveness both in purchase and in maintenance – and at the same time quick payback and high profitability.

Watch apartments

Apartments 2B

Spacious apartments with a comfortable seating area in the living room, a separate bedroom with a double bed and a spacious bathroom. The highlight of the room is a separate panoramic window facing the bedroom, a panorama in two different directions and a large living room (23.4 m2).

Watch apartments

Just three steps
to the apartments of your dreams
Choose Planning

The apartments are designed so that we will definitely find the perfect option for you. The decommissioning to the end of construction is a great opportunity to choose what you like

Contact us

Our managers give you an answers to the questions about the object, terms of construction, options for payment, the procedure for concluding contracts, permits and the opportunity to receive income from lease

Become the owner

Ownership of apartments gives you access to privileges when visiting objects in the complex and guaranteed income from 15% per annum

Snizhana
Sales Manager
Oksana
CONTACT US
Working hours

Mon-Fri from 9:00 to 19:00

Sat-Sun from 10:00 to 16:00

office

Kiev

st. Marshal Timoshenko, 29-b

Object address

 Visni
Village Polanyca
Yaremcha Ivano-Frankovsk region

About Project

New construction of hotel and tourist complex with apartments in school Cherries, p. Polyanytsya, Yaremcha city Ivano-Frankivsk region

Still have questions?

Developer

LLC "MBS-UKRINVEST" has sufficient experience in the construction of residential projects in Kyiv, such as Silver Breeze, LCD Novodarnytsky, as well as a partner in the Orange City development project. Participated in the construction of the Boryspil airport

Comfortable apartments in the Carpathians for relaxation

Currently, Bukovel is considered the most popular and comfortable option of rest. They come here with whole families at any time of the year. This ski resort boasts clean air, magnificent views of mountain peaks, stormy waterfalls, etc. Not only Ukrainians but also many tourists from abroad come here. Here they dream not only to rest, but also to buy real estate in the Carpathians for permanent residence. Buy real estate Bukovel. Why Le Meandre invites everybody to make profitable investments in Bukovel, offering to buy comfortable apartments for personal use or for commercial purposes. The rest here is a memorable moment forever. Who will not be happy to ski, skate, snowboard or spend time walking on the waterfalls, swimming in healing springs? In addition, local forests are famous for a variety of berries and a large number of mushrooms. in the side, for this purpose there are all conditions.Complex apartments of Bukovel.special advantagesCarpati have always been famous for their ecology, there is preserved a large number of nature-neglected people.If you decide to buy real estate close by Bukovel or in the newly built complex you get a number of advantages in the form of beautiful nature, opportunities to have a great rest at any time of the year, etc. The terms of purchase of apartments in a seven-storey residential complex are quite comfortable, the initial contribution must be at least 30 %. You will be offered a choice of apartments of 164 offered, they differ in planning and area. You are offered to buy apartments in Bukovel for personal use or for commercial purposes in a beautiful house with metal and glass, beautiful fit into the local landscape. Acquisition of this property is a special advantage for you: accessibility of transport, at any time you can climb on a nearby ski lift and skiing, return on investment is guaranteed, due to the high dynamics of attendance at the resort; construction is conducted on a legal basis, all documents are in stock and Completely transparent, in the nearest available park and forest zone, waterfalls, mountains, on the first floors of the complex will be located SPA, swimming pool, sauna, restaurant, bar and much more. Investments in Le Meandre is a profitable investment i.